View Complaint
Date Of Complaint
01/14/2008
Complaint
Mr. Sanford won't come back and repair system he installed.
Date Of Resolution
01/25/2008
Investigation History
Mr. Johnson spoke with me by telephone regarding his complaint. I referred him to Lisa Taylor.
01/15/08 I got e-mail from Lisa Taylor asking me to visit site.
01/16/08 I spoke with Richard Sanford regarding situation.
01/23/2008 I visited site and met with Thomas Johnson. Soil borings revealed soil textures of loam-heavy loam. A Bx with gray mottles was noted at 41 inches. It was noted that the field line drops drastically down the sideslope and there is seepage at the end. Mr. Johnson said the end of the pipe was left on top of the ground- although due to vegetation and overgrowth I did not observe a positive discharge from this system.
01/25/2008
Enforcement notice sent from Lisa Taylor to Richard Sanford.