Site Evaluation and Construction Planning

The absorption trenches should be placed perpendicular to the slope. Another way of saying this is that the trenches will be parallel to the contour lines.

PreviousBack Arrow Forward ArrowNext

Back ArrowReturn to Main Menu © Copyright